Annual rainfall in Belgium has remained between 700 and 900 millimetres for decades. What is changing is its intensity. Rainfall events of 60 to 100 millimetres per hour are becoming increasingly frequent. Combine this with the high degree of urbanisation, particularly in Flanders and Brussels, which makes it increasingly difficult for rainwater to reach the soil or drainage systems, and the problem is clear. Meanwhile, at other times we face prolonged periods of heat and drought.

The summers of recent years have repeatedly confirmed it: weather conditions are becoming more extreme in both directions. These changes mean we need to rethink how we manage rainwater. When do we have too much rainwater, and when is there a shortage?

Under the name ZinCo Meteo Active, ZinCo has developed four basic systems for retention roofs, which can be customised to suit each project.

The status quo

At present, almost all surfaces in cities discharge rainwater directly into the sewer system. Streets, squares and conventional roofs are designed to drain rainwater as quickly as possible. During heavy downpours, however, this places enormous peak loads on the sewer network. It is precisely these peaks that need to be reduced, by storing rainwater temporarily and releasing it gradually or at a later time.

At the same time, it is clear that rainwater discharged into the sewer system today may be desperately needed again just a few weeks later. During longer periods of drought, the surrounding area heats up considerably, which can put planting under severe strain. It would be useful to have the rainwater discharged earlier available again at such times.

Guidelines and requirements

To ease the burden on sewer systems, municipalities now all set guidelines and requirements for rainwater management, for both new builds and renovation projects. These rainwater regulations are generally aligned with the capacity of the sewer system and may, for example, specify the number of millimetres of rainfall that must be retained, as well as the period after which the retention volume must be available again to capture the next rainfall event. The precise requirements depend on the municipality and the circumstances. For example, different requirements apply when rainwater is reused than when it is discharged back into the sewer system.

A retention roof was chosen for the Green Court project in Gent.

Detention or retention?

Rainwater tanks and infiltration facilities are traditional solutions, but much of the answer lies on the roof. Green roofs have long been recognised as water buffers that help prevent flooding. However, conventional green roofs cannot be ‘controlled’, meaning it is uncertain at the start of a rainfall event exactly how much water they can hold. 

That is possible with a retention roof, also known as a blue-green roof. This solution creates an open space beneath the green roof or roof garden build-up, where water levels can be controlled. This allows rainwater to be managed passively or actively. Please note: a retention roof is only possible on flat roofs.

The roof’s load-bearing capacity is a key consideration.

A solution tailored to the project

There is no ‘one size fits all’ solution for retention roofs. Each project has specific requirements and circumstances that call for a tailored solution. As with other green roofs, the roof’s load-bearing capacity remains the most important factor. For new builds, this can be taken into account when setting the requirements for the retention roof. For renovation projects, however, it is a determining factor, and often a limiting one, when considering the possible solutions. The requirements and preferences of the municipality and/or client also determine what is appropriate for the project in question.

ZinCo has developed four basic retention roof systems as the basis for project-specific solutions. A basic system is selected based on load-bearing capacity, preferences and requirements, then developed and optimised for the individual project. This results in a tailored solution that avoids problems such as over-sizing and unnecessary costs.  

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeHealthy soil and smart water management