A dull asphalt car park has been transformed into an inviting, traffic-free square with as much greenery as possible. The new square in Waregem provides space for walking and cycling, while also accommodating occasional heavier traffic. For the paving and seating elements, the project team turned to precast concrete specialist STRADUS, a member of FEBESTRAL, the division within FEBE that represents manufacturers of precast concrete products for the paving market. Jeroen Vanhollemeersch, senior infrastructure project manager, and Kristof Van Impe, senior landscape architecture expert at engineering, consultancy and design firm Sweco, explain how this impressive depaving project took shape.

The paths, planting beds and swales together follow an organic form.

FEBE is the recognised trade association for manufacturers of precast concrete products and represents the interests of the sector. The Belgian concrete industry produces a wide range of precast elements for construction, from simple, unreinforced products such as masonry blocks and paving stones to large structural elements such as bridge beams. Within FEBE, FEBESTRAL operates as a division bringing together manufacturers of precast concrete products for the paving market, including concrete paving stones, concrete slabs, linear elements and accessories. FEBESTRAL supports the marketing of its members’ products, both technically and promotionally.

Landmark 

Waregem once again demonstrated that precast concrete is an ideal material for shaping public spaces. The site is located alongside the ring road (R35), by the Elindus Arena football stadium and opposite Waregem Expo. “Until recently, this was little more than an asphalt car park beside the stadium,” says Jeroen Vanhollemeersch. “The city authorities asked us to turn the square into a landmark and a gateway to the city. Given the dense development, our design needed to incorporate as much greenery as possible. The planned construction of an office building, a hotel and two apartment blocks, as well as the renovation of the football stadium, also called for a dynamic, flexible layout. On home match days for Essevee, around 12,000 people are in the immediate vicinity. On other days, the new public space is a pleasant place to meet and relax.”

The new square in Waregem provides space for walking and cycling, while also accommodating occasional heavier traffic.

Net reduction in paved area of around 50%

The asphalt car park, which had only a few small, narrow strips of greenery, has been cleared of traffic and is now accessible only to the emergency services and to broadcast vehicles (radio and TV) on home match days. Jeroen Vanhollemeersch explains: “One of our priorities was to collect rainwater. Water now runs off the paved areas into the swales, where it is stored and can infiltrate the ground. If the water level gets too high, it overflows through special gully connections into the stormwater drainage system. The paths for pedestrians and cyclists are made of exposed-aggregate concrete. The extra width required for emergency vehicles and the area for broadcast vehicles have been paved with green paving, laid on a permeable sub-base. The current paved area covers 5,850 m², of which 1,600 m² is green paving. Compared with the 8,000 m² of paved area before, this represents a reduction of almost 50%.”

An organic yet clean-lined design

“The design was shaped partly by the expected pedestrian routes,” adds Kristof Van Impe. “We also wanted to respond to the architecture of the different buildings on the site. This resulted in a clean-lined design. The paths, planting beds and swales together follow an organic form. To create some contrast, we chose semi-open pavers in a clean-lined pattern, made up of 50% concrete and 50% grass. This creates an attractive interplay of lines. Easy access is also important for the seating areas. We achieved this by using a solid paver in the same size as the green paving. Here, we opted for the Hydro Lineo XL concept, which combines a solid model with semi-open green pavers and is also strong enough to withstand heavier loads, such as those from fire engines and broadcast vehicles.”

Given the dense development, the design needed to incorporate as much greenery as possible.

Harmonious planting beds

“Seven green islands have been created across the square, blending harmoniously into the organic design. A simple, wide edging around the planting beds integrates the seating elements into the same overall movement. The edging kerbs were made to measure, and the transition kerbs leading into the seating elements from the Solids and Seats ranges were also adapted to ensure a neat connection with the edging. For the seating elements, we chose a mix of 50% Solids and 50% Seats. The latter have a wooden finish, with a seat and, in some places, a backrest. We limited the range of materials to create a sense of calm and harmony,” concludes Kristof Van Impe.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeWater and hard landscaping in the garden
  • SubjectPublic green spaces
Share this article

Follow on GreenPro Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.